Calculated Angles

Liebherr LTM1130-5.1

The Flash – 130t class.

Challenging but not impossible. The steep incline was complicated by tight conditions in a built up suburban street. While this looks like a delicate balancing act the whole process is computer calculated and monitored to ensure safety throughout the entire lift. This is why we invest in the best equipment available.

Biglift on the Stage

Liebherr LTM1130-5.1

The Flash – 130t class.

From time to time Biglift Cranes works in conjunction with our partner companies when workloads increase beyond capacity, we always go further to ensure our client just need to make one call to Biglift and we will manage the whole project. Here you see the new stage going in Brisbane for the Foo Fighters

Trifecta Lift

BIGLIFT GETS THE TRIFECTA

145T VESSEL WITH EASE

Tricrane_lift_1

Different regulation from state to state makes life difficult at best for transport operators and even more so when road works or other things cause changes to project planning. That’s why in this case Biglift Cranes came to the rescue of HHA who were forced to change Platform trailers for the descent down Cunninghams Pass. Biglift where engaged to assist by lifting the 145T vessel off one platform and hold the load for the replacement platform to receive it. The task was simple, however the lift featuring 3 of Biglifts Liebherr All-Terrian cranes (100t, 130 and 250t) was very in depth and required careful consideration to the vessels centre of gravity and the load factoring for a multi-crane lift. Dave Hopper our Heavy Lift Manager calculated the sharing of the load and the setup of each crane to ensure all 3 operated within the design of the lift plan.

The following weights were achieved on each crane – 250t resulted in 78t hook weight, the 130t had 38t on the hook and the 100t had 29t on the hook. All cranes capacities at their given radius would have exceeded these known masses as required by the Australia Standards and as required for such lifts which are deemed “Critical Lifts” due to the many factors that are in play with 3 cranes working together.

Well done to Biglift Cranes for an outstandingly SAFE job.

 

Tricrane_lift_2

With the Platform removed the strength of the 3 Biglift cranes was exceptional and the replacement platform was posiitioned to accept its new cargo for the trip into QLD.

Tricrane_lift_3

The Big Chief

LIEBHERR LTM1250-6.1 250T CLASS CRANE CALLED THE BIG CHIEF

As the largest crane in our fleet this particular unit had to be named the The Big Chief and sports the famous HHA colours matching our Larapinta office design and having 2 trucks named after it, the first is the famous Western Star “The Lone Ranger” the private truck of the HHA Owner and The Scout which of course is the chiefs horse and dedicated counterweight truck to the crane division. The chief has a 72mtr main boom with an additional 22mtr of swing away jig and is a specialist crane suited to tower crane erection or heavy assembly work. This large unit sports a Liebherr V8 612HP Turbo Diesel engine with an Automatic transmission with 12 forward gears and 2 reverse gears it makes even our truckers envious, coupled with a dedicated Liebherr 4cyl 245HP turbo engine to run the hydraulics up stairs The Big Chief has the grunt to get the job done. Travelling down the road The Big Chief is 25mtr long and runs on 6 axles with a trailing dolly with 3 axles – yes that’s 9 axle in total it no wonder it has 612HP up front!